Specification

Land Area:

Building Area:

Clear Height:

Each B1, B2: 2.02 rai.   Each B3, B4: 1.68 rai

Gross – 1,552 square metres each (if rent together 3,104 sqm.)

Factory area – 1,294 square metres each (if rent together 2,588 sqm.)

Office area - 258 square metres each (if rent together 516sqm.)

Rough Dimension – 24m.x65m. (if together 48m. X65m.)

Two 18-wheel truck loading bay – 151 square metres (together 302sqm.)

8 metres

RC Structure with steel column and roof frame
Metal sheet roof with2” glass wool insulation
Steel Trowelled floor finish

Able to fix 5 ton overhead crane

Floor Level:

3 Tons

Floor Loading Capacity:

On-Site Parking:

Electricity Load:

10 parking spaces plus motorcycle parkings and two 18-wheeltruck loading bays (together 20 parking and four 18-wheel bays)

MDB and wire to MDB support 30(100)Amp 3Phase = 50KW

Structure:

+135 centimetres raise floor from ground level

+180 centimetres raise up from fronting road level

Layout

B.jpg
A 2nd fl.jpg

Common Facilities

Utilities and Facilities:

Electricity, water supply, waste water treatment provided by Bangplee Industrial Estate

More Description

Structure

Factory Floor:

Office Floor:

Clearance:

Wall:

Reinforced concrete slab on piles 20 cm. thick, LL. 3 tons/sq.m.

Reinforcement concrete slap, LL. 400 kg./sq.m.

Ground floor 2.60 m., and mezzanine floor 2.60 m.

10 cm. concrete block with mortar, plaster, acrylic paint

Other Land Improvement

Road

Perimater Fence

Gate

Guard House

Water Storage:

Drainage System:

Sewer Drainage

Flag Pole:

Reinforcement concrete slab on compacted ground

Concrete block fence, wiremesh net fence

Rectangular tube on steel frame, 8 m. wide sliding main gate

1.1 m. x 1.1 m. Height 2.5m

1 cubic meter

Storm Drainage - underground reinforcement concrete pipe

(A1,A2 dia.30 cm. B1,B2,C1,C2 dia.40 cm.)

PVC pipe 4inch drainage channel

Underground PVC pipe 4inch (septic tank 3.3 cubic meter)

Two 8m. tall and One 9m. tall